Showing 1 - 10 of 57
Persistent link: https://www.econbiz.de/10001230953
We consider the classical resource-constrained project scheduling problem (RCPSP). The paper gives a detailed algorithmic description and provides theoretical results on two widely known problem specific heuristics: The serial and the parallel scheduling scheme. An in-depth computational study...
Persistent link: https://www.econbiz.de/10011739559
Persistent link: https://www.econbiz.de/10001737244
Persistent link: https://www.econbiz.de/10011735568
Persistent link: https://www.econbiz.de/10011558729
Persistent link: https://www.econbiz.de/10011558734
We present a set of benchmark instances for the evaluation of Solution procedures for single- and multi-mode resource-constrained project scheduling problems. The instances have been systematically generated by the Standard project generator ProGen. They are characterized by the input-parameters...
Persistent link: https://www.econbiz.de/10011594623
This study assesses the quality of seven commercial project management systems to perform finite scheduling. We give a brief survey of the way commercial project management systems work and especially how they perform finite scheduling. Since the implemented methods are proprietary, we measure...
Persistent link: https://www.econbiz.de/10011594624
The paper describes an algorithm for the generation of a general class of precedence- and resource-constrained scheduling problems. Easy and hard instances for the single- and multi-mode resource-constrained project scheduling problem are benchmarked by using the state of the art...
Persistent link: https://www.econbiz.de/10011613720
We consider the resource-constrained project scheduling problem (RCPSP). The focus of the paper is on a formal definition of semi-active, active, and non-delay schedules. Traditionally these schedules establish basic concepts within the job shop scheduling literature. There they are usually...