Showing 1 - 10 of 191
Persistent link: https://www.econbiz.de/10000620293
Persistent link: https://www.econbiz.de/10001709005
Persistent link: https://www.econbiz.de/10001477524
Persistent link: https://www.econbiz.de/10001376504
This contribution discusses the measurement of (in-)stability of finite horizon production planning when done on a rolling horizon basis. As examples we review strategic capacity expansion planning, tactical master production schedulng, and operational capacitated lot sizing.
Persistent link: https://www.econbiz.de/10011808833
On a very abstract level, an information system consists of a set of system elements which communicate with each other. Communication is an unproductive operation, so the time needed to communicate data should be kept as short as possible and, to put it in monetary terms, the opportunity costs...
Persistent link: https://www.econbiz.de/10011734226
While balancing straight assembly lines is a well-studied problem, the Situation where the assembly line has a U-shaped Iayout is a still emerging research field. The advantage of these lines is that workers may simply turn around to operate at two legs of the line. Hence, there is an additional...
Persistent link: https://www.econbiz.de/10011734653
Resource-constrained project scheduling under a net present value objective attracts growing interest. Because this is an NP-hard problem, it is unlikely that optimum solutions can be computed for large instances. Thus, heuristics have become a popular research field. Up to now, however, tight...
Persistent link: https://www.econbiz.de/10011734980
Persistent link: https://www.econbiz.de/10011735689
Persistent link: https://www.econbiz.de/10011735695