Showing 1 - 10 of 97
Persistent link: https://www.econbiz.de/10012546166
Persistent link: https://www.econbiz.de/10010393961
Persistent link: https://www.econbiz.de/10014540592
We consider here term and whole-life cases of the equity-linked life insurance(ELLI), and the guaranteed annuity option (GAO). We present a financial instrument which is a combination of ELLI and GAO in a stochastic interest rate framework.
Persistent link: https://www.econbiz.de/10008529213
We develop simple procedures to test for omitted variables and perform other tests in regression directions, which are asymptotically valid in the presence of heteroskedasticity of unknown form. We examine the asymptotic behaviour of these tests, and use Edgeworth approximations to study their...
Persistent link: https://www.econbiz.de/10011940424
We stablish the validity of higher order asymptotic expansions to the distribution of a version of the nonlinear semiparametric instrumental variable considered in Newey (1990) as well as to the distribution of a Wald statistic derived from it. We emply local polynomial smoothing with variable...
Persistent link: https://www.econbiz.de/10005310370
We develop simple procedures to test for omitted variables and perform other tests in regression directions, which are asymptotically valid in the presence of heteroskedasticity of unknown form. We examine the asymptotic behaviour of these tests, and use Edgeworth approximations to study their...
Persistent link: https://www.econbiz.de/10005653228
We establish the validity of higher order asymptotic expansions to the distribution of a version of the nonlinear semiparametric instrumental variable considered in Newey (1990) as well as to the distribution of a Wald statistic derived from it. We employ local polynomial smoothing with variable...
Persistent link: https://www.econbiz.de/10011071228
Persistent link: https://www.econbiz.de/10005395708
Purpose: The goal of this article is to provide an extensive literature review of the models and solution procedures proposed by many researchers interested on the Project Scheduling Problem with non-deterministic activities duration. Design/methodology/approach: This paper presents an...
Persistent link: https://www.econbiz.de/10011939369