Showing 1 - 2 of 2
Persistent link: https://www.econbiz.de/10011724442
The paper makes an attempt to minimize the makespan and total tardiness in the flow shop scheduling using Artificial Neural Network (ANN). A feed forward back propagation neural network is implemented for the optimal solution of the problem. The network has been trained with the optimal...
Persistent link: https://www.econbiz.de/10014114124