The current-revision of the Process Optimization Program contains two empirical plutonium-exposure expressions. One relates total Pu conversion to exposure and the other, Pu-240 buildup to exposure. The former was incorporated to save computer time and the latter to provide product quality data....
Persistent link: https://www.econbiz.de/10009436728
The Work Breakdown Structure (WBS) Book begins with this Overview section, which contains the high-level summary cost estimate, the cost profile, and the global construction schedule. The summary cost estimate shows the total US cost and the cost in terms of PHENIX construction funds for...
Persistent link: https://www.econbiz.de/10009436123
The Work Breakdown Structure (WBS) Book begins with this Overview section, which contains the high-level summary cost estimate, the cost profile, and the global construction schedule. The summary cost estimate shows the total US cost and the cost in terms of PHENIX construction funds for...
Persistent link: https://www.econbiz.de/10009436125
schedules, providing an accurate and efficient ''what if'' capability for users. Although the tool used for this case study … interfaces with Primavera Project Planner{reg_sign} (P3) schedules, the same methodology can be applied to other commercial off …
Persistent link: https://www.econbiz.de/10009436194
This volume contains information on cost estimates, planning schedules, yearly cost flowcharts, and life-cycle costs …
Persistent link: https://www.econbiz.de/10009436860
The Basis of Estimate Software Tool (BEST) was developed at the Rocky Flats Environmental Technology Site (Rocky Flats) to bridge the gap that exists in conventional project control systems between scheduled activities, their allocated or assigned resources, and the set of assumptions (basis of...
Persistent link: https://www.econbiz.de/10009437341
In 1999 a practical example illustrating the economical and reliable production of 99mTc from an accelerator was … established to account for inflation and current demand. The same distribution model and production schedule from the Global ‘99 …
Persistent link: https://www.econbiz.de/10009435643
production incentive (REPI) available only to publicly owned utilities. Possible economic advantages to entering into a PPA with … a NUG include: (1) the availability of federal tax credits and accelerated depreciation schedules for certain forms of … NUG-owned renewable energy, and (2) the California state production incentives available to NUGs but not utilities. This …
Persistent link: https://www.econbiz.de/10009435943
project was successful in completing the analysis of the energy production from the solar power systems at Grand Canyon West …
Persistent link: https://www.econbiz.de/10009437263
The Biofuels Feedstock Development Program has attempted to estimate the cost of producing dedicated energy crops for several regions of the United States. Switchgrass and hybrid poplar have been chosen as representative herbaceous and woody crop species for the estimation. A full economic cost...
Persistent link: https://www.econbiz.de/10009436835