Showing 1 - 10 of 2,463
Decisions throughout the life cycle of a building, from design through construction and commissioning to operation and demolition, require the involvement of multiple interested parties (e.g., architects, engineers, owners, occupants and facility managers). The performance of alternative designs...
Persistent link: https://www.econbiz.de/10009435712
Over the past several decades, the development of computer models to predict the atmospheric transport of hazardous material across a local (on the order of 10s of km) to mesoscale (on the order of 100s of km) region has received considerable attention, for both regulatory purposes, and to guide...
Persistent link: https://www.econbiz.de/10009435983
The current-revision of the Process Optimization Program contains two empirical plutonium-exposure expressions. One relates total Pu conversion to exposure and the other, Pu-240 buildup to exposure. The former was incorporated to save computer time and the latter to provide product quality data....
Persistent link: https://www.econbiz.de/10009436728
As part of a study aimed at estimating suburban highway needs for year 2005, models were developed for forecasting daily vehicle miles of travel (DVMT) for urban areas and its distribution by highway functional class, urban location, and urban area size. A regression model combining both time...
Persistent link: https://www.econbiz.de/10009435975
Programs in Perspective is the Bonneville Power Administration's public involvement process (PIP) for engaging customers and other stakeholders in a regional dialog to set strategic direction and broad program plans for BPA effort. This planning leads into a biennial rate setting cycle and...
Persistent link: https://www.econbiz.de/10009435625
your site could deliver as nitrate by above dates; (b) schedules on which you could deliver half of the quantities; (c …) schedules on which you could deliver the full quantities; (d) pre-authorization steps recommended to expedite program. Please … provide schedules that could be reasonably guaranteed, since they could become commitments. Consider possible difficulties in …
Persistent link: https://www.econbiz.de/10009435699
The Work Breakdown Structure (WBS) Book begins with this Overview section, which contains the high-level summary cost estimate, the cost profile, and the global construction schedule. The summary cost estimate shows the total US cost and the cost in terms of PHENIX construction funds for...
Persistent link: https://www.econbiz.de/10009436123
The Work Breakdown Structure (WBS) Book begins with this Overview section, which contains the high-level summary cost estimate, the cost profile, and the global construction schedule. The summary cost estimate shows the total US cost and the cost in terms of PHENIX construction funds for...
Persistent link: https://www.econbiz.de/10009436125
This volume contains information on cost estimates, planning schedules, yearly cost flowcharts, and life-cycle costs …
Persistent link: https://www.econbiz.de/10009436860
The Basis of Estimate Software Tool (BEST) was developed at the Rocky Flats Environmental Technology Site (Rocky Flats) to bridge the gap that exists in conventional project control systems between scheduled activities, their allocated or assigned resources, and the set of assumptions (basis of...
Persistent link: https://www.econbiz.de/10009437341