Showing 1 - 10 of 67,188
The degradation of the material in critical components is shown to be an effective measure which can be used to compute the risk adjusted economic penalty associated with different maintenance decisions. The approach of estimating the probability, with confidence interval, of the time that a...
Persistent link: https://www.econbiz.de/10009435687
This paper deals with the market for SO{sub 2} emission allowances over time and electric utility compliance choices … scrubber incentives in Phase 1, there is likely to be substantial emission banking for use in Phase 2. Allowance prices are … or other potential speculators in the allowance market are not expected to bank allowances. The allowances will be banked …
Persistent link: https://www.econbiz.de/10009435433
bidding. Competition in awarding cleanup contracts can make use of market incentives to lower project costs and reduce … completion of projects from a cost-plus Management and Operations (M and O) contract, to incentive-based contracts with the … slippage time. Fixed-price contracts encourage contractors to minimize schedule delays and cost overruns once the scope of a …
Persistent link: https://www.econbiz.de/10009435824
. The materials costs are current Los Alamos prices. Additional information sources include material and equipment quotes …The Los Alamos National Laboratory Building Cost Index indicates that actual escalation since 1970 is near 10% per year … the cost of a typical construction project, which for our purposes, is a complex of office buildings and experimental …
Persistent link: https://www.econbiz.de/10009435470
procurement decisions that are valid for the life of the equipment. This describes a method of financial analysis that considers …Until the 1970s, it was commonplace for institutions and governments to purchase equipment based on lowest initial … equipment or yearly recurring costs such as energy and maintenance costs. The practice of purchasing based on lowest initial …
Persistent link: https://www.econbiz.de/10009435904
This audit was performed to follow up on actions taken in response to the July 1990 report on ``Procurement of Support … the cost-reimbursement contracts examined was recurring and could have been estimated with a reasonable degree of accuracy … making the work suitable for fixed-price contracting. The report made recommendations to the Head of Procurement and the …
Persistent link: https://www.econbiz.de/10009435599
. Consequently, the Department may have decreased their ability to control cost growth on these three contracts. As discussed in Part …. However, one of six cost-plus-award-fee contractors received award fees that exceeded its performance ratings by $89 …
Persistent link: https://www.econbiz.de/10009437314
, and prices for publication in February, May, August, and November in the Short-Term Energy Outlook (Outlook). An annual …
Persistent link: https://www.econbiz.de/10009437393
public procurement can play a significant role in market transformation through its influence on both buyers and suppliers … leading manufacturers and distributors to increase their sales and market share by offering energy-efficient products at … competitive prices. Under proper circumstances, a highly visible government purchasing policy can have a disproportionately large …
Persistent link: https://www.econbiz.de/10009436121
With the end of the Cold War and the election of President Clinton, the Department of Energy (DOE) set a new course which began with the publication of its first departmental strategic plan in April 1994. Entitled ``Fueling a Competitive Economy, it provided the framework and shared vision for...
Persistent link: https://www.econbiz.de/10009436572