Showing 1 - 10 of 524
This paper describes lessons learned over the last 20 years from 12 decommissioning projects at Los Alamos National Laboratory. These lessons relate both to overall program management and to management of specific projects during the planning and operations phases. The issues include waste...
Persistent link: https://www.econbiz.de/10009436876
The purpose of this inspection was to review the economy and efficiency of Idaho`s Fiscal Year 1992 Cost Reduction Incentive Program, as well as to provide information to Departmental officials regarding any difficulties in administering these types of programs. The report is of the findings and...
Persistent link: https://www.econbiz.de/10009436723
The US Department of Energy (DOE) and its contractors have long been pioneers in the field of radiological performance assessment (PA). Much effort has been expended in developing technology and acquiring data to facilitate the assessment process. This is reflected in DOE Order 5820.2A,...
Persistent link: https://www.econbiz.de/10009436347
The two new shufflers at Los Alamos National Laboratory (LANL) have been used on uranium inventory items that could not be previously verified or confirmed because of the lack of a suitable assay instrument. A third shufflers at the Westinghouse Savannah River Site (SRS) is currently measuring...
Persistent link: https://www.econbiz.de/10009436407
In Fiscal Year 1998, the Federal Energy Technology Center (FETC) was responsible for managing about $723 million in budgetary resources. The objective of this audit was to determine if FETC had a funds distribution and control system to ensure appropriated funds were managed in accordance with...
Persistent link: https://www.econbiz.de/10009435397
The Office of Inspector General performed audits of the Small Disadvantaged Business Program at five management and operating contractors in FY 1994. The audits disclosed that none of the contractors fully met the intent of the Act and implementing regulations. The contractors awarded some...
Persistent link: https://www.econbiz.de/10009437081
Performance data for March 1995 reflects a continued unfavorable schedule variance and favorable cost variance. The March fiscal-year-to-date (FYTD) schedule variance is an unfavorable $105.5M. EM-30 (Office of Waste Management) is the biggest contributor ($81.9 million) to the behind-schedule...
Persistent link: https://www.econbiz.de/10009435483
A conceptual management framework is developed and applied in a science and engineering organization located within a non-profit, public institution. The goal of this research is to select a set of projects whose combined contributions to the organization`s strategic interests satisfy sponsor...
Persistent link: https://www.econbiz.de/10009435613
The mission of the Hanford Fire Department (HFD) is to support the safe and timely cleanup of the Hanford site by providing fire suppression, fire prevention, emergency rescue, emergency medical service, and hazardous materials response; and to be capable of dealing with and terminating emergency...
Persistent link: https://www.econbiz.de/10009435733
This document presents the risk-based prioritization methodology developed to evaluate and rank Environmental Restoration (ER) work packages at the five US Department of Energy, Oak Ridge Field Office (DOE-ORO) sites [i.e., Oak Ridge K-25 Site (K-25), Portsmouth Gaseous Diffusion Plant (PORTS),...
Persistent link: https://www.econbiz.de/10009436604