Showing 1 - 10 of 36,553
One critical factor in open pit mining projects is the estimation of the recoverable reserves. The reason for this is that at the valuation stage there is a lack of information about future metal prices and production costs. Consequently, the estimation of the recoverable reserves needs to be...
Persistent link: https://www.econbiz.de/10008694530
Persistent link: https://www.econbiz.de/10011516467
Persistent link: https://www.econbiz.de/10003752917
Persistent link: https://www.econbiz.de/10003941000
Persistent link: https://www.econbiz.de/10009719294
Persistent link: https://www.econbiz.de/10014370684
Persistent link: https://www.econbiz.de/10000475975
Persistent link: https://www.econbiz.de/10000451667
Persistent link: https://www.econbiz.de/10000535566
Persistent link: https://www.econbiz.de/10000536986