Showing 71 - 80 of 647,733
This article describes a heuristic for scheduling so-called ‘modular' projects. Exact solutions to this NP-hard problem can be obtained with existing branch-and-bound and dynamic-programming algorithms, but only for small to medium-size instances. The proposed heuristic, by contrast, can be...
Persistent link: https://www.econbiz.de/10013083810
In this paper we present a heuristic methodology for solving resource-constrained project scheduling problems with renewable and spatial resources. We especially concentrate on spatial resources that are encountered in construction projects, but our analysis can easily be generalized to other...
Persistent link: https://www.econbiz.de/10012725657
Persistent link: https://www.econbiz.de/10012588892
Persistent link: https://www.econbiz.de/10009657212
Persistent link: https://www.econbiz.de/10012439893
Persistent link: https://www.econbiz.de/10012224373
Persistent link: https://www.econbiz.de/10011947950
Persistent link: https://www.econbiz.de/10012214707
Persistent link: https://www.econbiz.de/10011735690
Persistent link: https://www.econbiz.de/10011735693