We consider the resource-constrained project scheduling problem. The purpose of this paper is to direct the focus to a branch-and-bound concept that can, by simple adaptations, operate on a wide range of problem settings. The general approach can, e.g., deal with multimode problems, resource...
Persistent link: https://www.econbiz.de/10009197319
The resource-constrained project scheduling problem (RCPSP) consists of activities that must be scheduled subject to precedence and resource constraints such that the makespan is minimized. It has become a well-known standard problem in the context of project scheduling which has attracted...
Persistent link: https://www.econbiz.de/10009018234
Management of projects is complicated by the scarcity of resources required to execute them. Limited resources usually extend the project completion times beyond those determined by CPM/PERT. Several solution procedures have been developed for solving the resource constrained project scheduling...
Persistent link: https://www.econbiz.de/10009214245
Resource-constrained project scheduling with generalised precedence constraints is a very general scheduling model with applications in areas such as make-to-order production planning. We describe a time-oriented branch-and-bound algorithm that uses constraint-propagation techniques which...
Persistent link: https://www.econbiz.de/10009214375
In project scheduling, a set of precedence-constrained jobs has to be scheduled so as to minimize a given objective. In resource-constrained project scheduling, the jobs additionally compete for scarce resources. Due to its universality, the latter problem has a variety of applications in...
Persistent link: https://www.econbiz.de/10009214730
We consider a generalization of the classical resource constrained project scheduling problem. We introduce so-called partially renewable resources by assuming for each resource a capacity on subsets of periods. The concept of partially renewable resources is a fundamental tool in order to make,...
Persistent link: https://www.econbiz.de/10009191542
In this paper a branch-and-bound procedure is described for scheduling the activities of a project of the PERT/CPM variety subject to precedence and resource constraints where the objective is to minimize project duration. The procedure is based on a depth-first solution strategy in which nodes...
Persistent link: https://www.econbiz.de/10009198063
Inventory constraints refer to so-called cumulative resources, which can store a single or several different products and have a prescribed minimum and maximum inventory, where the inventory is depleted and replenished over time. Some additional applications of cumulative resources, e.g. to...
Persistent link: https://www.econbiz.de/10010847935
Inventory constraints refer to so-called cumulative resources, which can store a single or several different products and have a prescribed minimum and maximum inventory, where the inventory is depleted and replenished over time. Some additional applications of cumulative resources, e.g. to...
Persistent link: https://www.econbiz.de/10010999935