Showing 1 - 10 of 125,334
Over the years numerous branch-and-bound procedures for solving the resource-constrained project scheduling problem (RCPSP) have been developed. Enumerating delaying alternatives, extension alternatives, feasible posets, feasible sequences, feasible completion times or feasible subsets, they all...
Persistent link: https://www.econbiz.de/10011735591
Persistent link: https://www.econbiz.de/10011787442
Persistent link: https://www.econbiz.de/10011787456
Persistent link: https://www.econbiz.de/10011806934
Persistent link: https://www.econbiz.de/10011806935
Numerous exact algorithms have been developed for solving the resource-constrained project scheduling problem. Experimental studies have shown that currently even projects with only 60 activities cannot be optimally solved within a reasonable amount of time. Therefore heuristics employing...
Persistent link: https://www.econbiz.de/10011734961
Over the years numerous branch-and-bound procedures for solving the resource-constrained project scheduling problem have been developed. Enumerating delaying alternatives, extension alternatives, feasible posets, feasible sequences or feasible subsets, they all aim at finding as fast as possible...
Persistent link: https://www.econbiz.de/10011736624
We consider a generalization of the classical resource constrained project scheduling problem. We introduce so-called partially reiiewable resources by assuming for each resource a capacity on subsets of periods. The concept of partially renewable resources is a fundamental tool in order to make...
Persistent link: https://www.econbiz.de/10011808900
We consider the multi-mode resource-constrained project scheduling problem. The focus is on an algorithm which is supposed to find a makespan optimal solution. This algorithm has been presented in a recent paper by Speranza and Vercellis. The correctness of the algorithm is examined. Moreover,...
Persistent link: https://www.econbiz.de/10011739501
Persistent link: https://www.econbiz.de/10011806938