Showing 1 - 10 of 652,197
This paper addresses the airport flight gate assignment problem with multiple objectives. The objectives are to maximize the total flight gate preferences, to minimize the number of towing activities and to minimize the absolute deviation of the new gate assignment from a so-called reference...
Persistent link: https://www.econbiz.de/10011745241
This paper addresses an airport gate assignment problem with multiple objectives. The objectives are to minimize the number of ungated flights and the total passenger walking distances or connection times as well as to maximize the total gate assignment preferences. The problem examined is an...
Persistent link: https://www.econbiz.de/10011799801
This paper addresses an airport gate assignment problem with multiple objectives. The objectives are to minimize the number of ungated flights and the total passenger walking distances or connection times as well as to maximize the total gate assignment preferences. The problem examined is an...
Persistent link: https://www.econbiz.de/10011808664
This paper addresses the multiple criteria flight gate assignment problem under uncertainty, which is naturally modeled by fuzzy numbers. The problem examined is a special kind of multicriteria multi-mode resource-constrained project scheduling problem with generalized precedence constraints or...
Persistent link: https://www.econbiz.de/10011558815
This paper addresses the multiple criteria flight gate assignment problem under uncertainty, which is naturally modeled by fuzzy numbers. The problem examined is a special kind of multicriteria multi-mode resource-constrained project scheduling problem with generalized precedence constraints or...
Persistent link: https://www.econbiz.de/10011723787
Persistent link: https://www.econbiz.de/10012238629
Persistent link: https://www.econbiz.de/10003281796
Persistent link: https://www.econbiz.de/10003281803
Persistent link: https://www.econbiz.de/10011745240
In project management, the project duration can often be compressed by accelerating some of its activities at an additional expense. This is the so-called time-cost tradeoff problem which has been extensively studied in the past. However, the discrete version of the problem which is of great...
Persistent link: https://www.econbiz.de/10011558760