Reengineering Materials Management Operation
Year of publication: |
1995
|
---|---|
Authors: | Amar, Amar Dev |
Published in: |
Production and inventory management journal : journal of the American Production and Inventory Control Society, Inc. - Washington, DC : Soc., ISSN 0897-8336, ZDB-ID 10542929. - Vol. 36.1995, 4, p. 22-26
|
Saved in:
Saved in favorites
Similar items by person
-
Costs in design of scheduling algorithms: A study on branch-and-bound methodology
Amar, Amar Dev, (1997)
-
The problem of assigning jobs to machines with special reference to parallel identical processors
Amar, Amar Dev, (1980)
- More ...