//-->
Biogeography-based optimisation for flexible manufacturing system scheduling problem
Shahla Paslar, (2015)
A review of methods and algorithms for optimizing construction scheduling
Zhou, J., (2013)
Robust MILP formulations for the two-stage weighted vertex p-center problem
Duran-Mateluna, Cristian, (2023)
Minmax regret approach and optimality evaluation in combinatorial optimization problems with interval and fuzzy weights
Kasperski, Adam, (2009)
A randomized algorithm for the min-max selecting items problem with uncertain weights
Approximating a two-machine flow shop scheduling under discrete scenario uncertainty
Kasperski, Adam, (2012)