A bi-objective MILP model for an open-shop scheduling problem with reverse flows and sequence-dependent setup times
Year of publication: |
2024
|
---|---|
Authors: | Aghighi, Saba ; Mehdizadeh, Esmaeil ; Niaki, Seyed Taghi Akhavan ; Najafi, Amir Abbas |
Published in: |
European journal of industrial engineering : EJIE. - Genevè : Inderscience Enterprises, ISSN 1751-5262, ZDB-ID 2435893-9. - Vol. 18.2024, 3, p. 433-468
|
Subject: | MOVDO | open-shop scheduling problem | OSSP | reverse flows | SDST | sequence-dependent setup times | vibration damping-based optimisation algorithm | Scheduling-Verfahren | Scheduling problem | Durchlaufzeit | Lead time | Algorithmus | Algorithm | Theorie | Theory | Heuristik | Heuristics | Evolutionärer Algorithmus | Evolutionary algorithm |
-
Anjana, V., (2023)
-
Xu, Hongyun, (2014)
-
Zhao, Yue, (2020)
- More ...
-
Project scheduling and equipment planning with random breakdowns
Sharifkhani, Abbas, (2017)
-
Mehdizadeh, Esmaeil, (2018)
-
Mehdizadeh, Esmaeil, (2020)
- More ...