A branch and bound algorithm for disassembly scheduling with assembly product structure⋆
Year of publication: |
2009
|
---|---|
Authors: | Kim, H.-J. ; Lee, D.-H. ; Xirouchakis, P. ; Kwon, O.K. |
Published in: |
Journal of the Operational Research Society : OR. - Basingstoke, Hampshire : Palgrave, ISSN 0030-3623, ZDB-ID 7160331. - Vol. 60.2009, 3, p. 419-430
|
Saved in:
Saved in favorites
Similar items by person
-
Two-phase heuristic for disassembly scheduling with multiple product types and parts commonality
Kim, H.-J., (2006)
-
A Lagrangean heuristic algorithm for disassembly scheduling with capacity constraints
Kim, H.-J., (2006)
-
Disassembly scheduling: literature review and future research directions
Kim, H.-J., (2007)
- More ...