//-->
A branch and bound algorithm to minimize the number of late jobs in a permutation flow-shop
Hariri, A. M. A., (1989)
Algorithms for two-machine flow-shop sequencing with precedence constraints
Hariri, A. M. A., (1984)
Single machine scheduling to minimize total weighted late work
Hariri, A. M., (1992)