//-->
Level Scheduling under limitedResequencing Flexibility
Fliedner, Malte, (2010)
Level Scheduling for batched JIT supply
Fliedner, Malte, (2009)
The assembly line balancing and schedulingproblem with sequence-dependent setup times:Problem extension, model formulation andefficient heuristics
Scholl, Armin, (2009)