//-->
An investigation of the use of goal programming to fit response surfaces
Lewis Jr, R.P., (1995)
A heuristic model for the sequence-dependent lot scheduling problem
Taylor, G.D., (1997)
An analysis of intermodal ramp selection methods
Taylor, G.Don, (2002)