A construction of knowledge rules for reactive planning of job-mix assignment to homogeneous serial batch machines
Year of publication: |
2014
|
---|---|
Authors: | Chou, Yon-chun ; Lin, Yue-lan ; Chun, King-fai |
Published in: |
International journal of production economics. - Amsterdam [u.a.] : Elsevier, ISSN 0925-5273, ZDB-ID 1092526-0. - Vol. 151.2014, p. 56-66
|
Subject: | Job-machine assignment | Parallel machines | Reactive planning | Setup reduction | High-mix low-volume production | Meta rules | Theorie | Theory | Scheduling-Verfahren | Scheduling problem | Produktionsplanung | Production planning | Produktionssteuerung | Production control |
-
Chou, Yon-Chun, (2014)
-
A parallel machine lot-sizing and scheduling problem with a secondary resource and cumulative demand
Güngör, Murat, (2018)
-
Tempelmeier, Horst, (2016)
- More ...
-
Chou, Yon-Chun, (2014)
-
Managing dynamic demand events in semiconductor manufacturing chains by optimal control modelling
Chou, Yon-chun, (2007)
-
Chou, Yon-Chun, (2007)
- More ...