A Crane Scheduling Problem in a Computer-Integrated Manufacturing Environment
Year of publication: |
1991
|
---|---|
Authors: | Matsuo, Hirofumi ; Shang, Jen S. ; Sullivan, Robert S. |
Published in: |
Management Science. - Institute for Operations Research and the Management Sciences - INFORMS, ISSN 0025-1909. - Vol. 37.1991, 5, p. 587-606
|
Publisher: |
Institute for Operations Research and the Management Sciences - INFORMS |
Subject: | cyclic scheduling | material handling system | network flow formulation |
-
A Review Of Design And Control Of Automated Guided Vehicle Systems
Le-Anh, Le-Anh, T., (2004)
-
A Review Of Design And Control Of Automated Guided Vehicle Systems
Le-Anh, T., (2004)
-
Tavana, Madjid, (2014)
- More ...
-
A crane scheduling problem in a computer-integrated manufacturing environment
Matsuo, Hirofumi, (1991)
-
Fitzsimmons, James A., (1982)
-
Establishing the level of service for public emergency ambulance systems
Fitzsimmons, James A., (1979)
- More ...