//-->
The pull production system: modelling and characteristics
Siha, S., (1994)
A model for the optimal timing and sizing of capacity increments for single-location facilities
Siha, S., (1996)
SHRINKAGE CONSTRUCTIONS FOR PITMAN DOMINATION
Yoo, Seongmo, (1994)