//-->
A lot sizing model with queueing delays: The issue of safety time
Lambrecht, M.R., (1996)
A heuristic to control integrated multi-product multi-machine production-inventory systems with job shop routings and stochastic arrival, set-up and processing times
Nyen, P.L.M., (2005)
Supplier managed inventory in the OEM supply chain: the impact of relationship types on total costs and cost distribution
Nyen, P.L.M., (2009)