A heuristic for scheduling a permutation flowshop with makespan objective subject to maximum tardiness
Year of publication: |
2006
|
---|---|
Authors: | Framinan, Jose M. ; Leisten, Rainer |
Published in: |
International journal of production economics. - Amsterdam [u.a.] : Elsevier, ISSN 0925-5273, ZDB-ID 10925260. - Vol. 99.2006, 1-2, p. 28-40
|
Saved in:
Saved in favorites
Similar items by person
-
Framinan, Jose M., (2002)
-
Sequencing CONWIP flow-shops: analysis and heuristics
Framinan, Jose M., (2001)
-
Input control and dispatching rules in a dynamic CONWIP flow-shop
Framinan, Jose M., (2000)
- More ...