A hybrid metaheuristic for resource-constrained project scheduling with flexible resource profiles
Year of publication: |
1 October 2017
|
---|---|
Authors: | Tritschler, Martin ; Naber, Anulark ; Kolisch, Rainer |
Published in: |
European journal of operational research : EJOR. - Amsterdam : Elsevier, ISSN 0377-2217, ZDB-ID 243003-4. - Vol. 262.2017, 1 (1.10.), p. 262-273
|
Subject: | Project scheduling | Flexible resource profiles | Schedule generation scheme | Metaheuristics | Scheduling-Verfahren | Scheduling problem | Projektmanagement | Project management | Theorie | Theory | Heuristik | Heuristics | Flexibles Fertigungssystem | Flexible manufacturing system |
-
Van Peteghem, Vincent, (2014)
-
A metaheuristic solution approach for the time-constrained project scheduling problem
Verbeeck, Cédric, (2017)
-
A path relinking-based scatter search for the resource-constrained project scheduling problem
Berthaut, François, (2018)
- More ...
-
MIP models for resource-constrained project scheduling with flexible resource profiles
Naber, Anulark, (2014)
-
MIP models for resource-constrained project scheduling with flexible resource profiles
Naber, Anulark, (2014)
-
Comments on the RCPSP-Model of Bianco and Caramia (2013)
Naber, Anulark, (2013)
- More ...