//-->
Minimizing makespan in a two-stage system with flowshop and open shop
Su, Ling-Huey, (2005)
Heuristic for scheduling in a two-machine bicriteria dynamic flowshop with setup and processing times separated
Su, Ling-Huey, (2000)
Sports tournament scheduling to determine the required number of venues subject to the minimum timeslots under given formats
Su, Ling-Huey, (2013)