//-->
A modified harmony search algorithm for the multi-objective flowshop scheduling problem with due dates
Frosolini, M., (2011)
Failure rate prediction with artificial neural networks
Bevilacqua, M., (2005)
The house of reliability
Braglia, M., (2007)