A multi-objective iterated greedy search for flowshop scheduling with makespan and flowtime criteria
Year of publication: |
2008
|
---|---|
Authors: | Framinan, Jose M. ; Leisten, Rainer |
Published in: |
OR spectrum : quantitative approaches in management. - Berlin : Springer, ISSN 0171-6468, ZDB-ID 2073885-7. - Vol. 30.2008, 4, p. 787-804
|
Subject: | Scheduling-Verfahren | Scheduling problem | Fließfertigung | Assembly-line production | Heuristik | Heuristics | Operations Research | Operations research |
-
Minimizing Makespan in Flowshops with Pallet Requirements : Computational Complexity
Wang, M. W., (2010)
-
A Petri net-based heuristic for mixed-model assembly line balancing problem of Type-E
Su, Ping, (2014)
-
Pape, Tom, (2015)
- More ...
-
Framinan, Jose M., (2002)
-
Framinan, Jose M., (2006)
-
Sequencing CONWIP flow-shops: analysis and heuristics
Framinan, Jose M., (2001)
- More ...