//-->
A multi-start dynasearch algorithm for the time dependent single-machine total weighted tardiness scheduling problem
Angel, E., (2005)
Minimizing the schedule length for a parallel 3D-grid precedence graph
Bampis, E., (1996)
Minimizing the overhead for some tree-scheduling problems