A new approach for maintenance scheduling of generating units in electrical powe systems based on their operational hours
Year of publication: |
2014
|
---|---|
Authors: | Fattahi, M. ; Mahootchi, M. ; Mosadegh, H. ; Fallahi, F. |
Published in: |
Computers & operations research : and their applications to problems of world concern ; an international journal. - Oxford [u.a.] : Elsevier, ISSN 0305-0548, ZDB-ID 194012-0. - Vol. 50.2014, p. 61-79
|
Subject: | Generator maintenance scheduling | Unit commitment | Mixed-integer linear programming | Ant colony optimization | Simulated annealing | Heuristics | Scheduling-Verfahren | Scheduling problem | Instandhaltung | Maintenance policy | Heuristik | Elektrizitätswirtschaft | Electric power industry | Theorie | Theory | Mathematische Optimierung | Mathematical programming |
-
Okumuşoğlu, Bahar Cennet, (2024)
-
MILP models and metaheuristic for balancing and sequencing of mixed-model two-sided assembly lines
Nilakantan, J. Mukund, (2017)
-
Optimisation of yard crane scheduling considering velocity coefficient and preventive maintenance
Ghomi, M. S. Fatemi Ghomi, (2014)
- More ...
-
Fattahi, M., (2015)
-
Integrated strategic and tactical supply chain planning with price-sensitive demands
Fattahi, M., (2016)
-
Two-machine robotic cell scheduling problem with sequence-dependent setup times
Zarandi, M. H. Fazel, (2013)
- More ...