//-->
Erratum to "A note on a greedy heuristic for flow-shop makespan minimization with no machine idle-time" [European Journal of Operational Research, 184 (2) (2008), 810-813]
Baraz, Daniel, (2009)
A note on a greedy heuristic for flow-shop makespan minimization with no machine idle-time
Baraz, Daniel, (2008)
Erratum to “A note on a greedy heuristic for flow-shop makespan minimization with no machine idle-time” [European Journal of Operational Research, 184 (2) (2008), 810–813]