A note on analytic calculation of planned lead times for assembly systems under POQ policy and service level constraint
Year of publication: |
2012
|
---|---|
Authors: | Louly, Mohamed-Aly ; Dolgui, Alexandre |
Published in: |
International journal of production economics. - Amsterdam [u.a.] : Elsevier, ISSN 0925-5273, ZDB-ID 1092526-0. - Vol. 140.2012, 2, p. 778-781
|
Subject: | MRP parametrization | POQ policy | Random leadtime | Newboy model | Optimization | Fließfertigung | Assembly-line production | Durchlaufzeit | Lead time | Theorie | Theory | Mathematische Optimierung | Mathematical programming |
-
Complexity of the two-stage no-wait assembly problem with setup and removal times separated
Strusevich, Vitaly A., (1991)
-
Minimizing Makespan in Flowshops with Pallet Requirements : Computational Complexity
Wang, M. W., (2010)
-
Non-permutation flowshop scheduling in a supply chain with sequence-dependent setup times
Mehravaran, Yasaman, (2011)
- More ...
-
Louly, Mohamed-Aly, (2013)
-
Editorial: In 2012 IJPR published its 50th volume
Dolgui, Alexandre, (2013)
-
Editorial: leading scholars in production research for the 55th volume anniversary of IJPR
Dolgui, Alexandre, (2018)
- More ...