//-->
Two-machine flow shop and open shop scheduling problems with a single maintenance window
Mosheiov, Gur, (2018)
Hybrid firefly-simulated annealing algorithm for the flow shop problem with learning effects and flexible maintenance activities
Nouri, Behdin Vehedi, (2013)
Minimizing the makespan on a single machine with flexible maintenances and jobs' release dates
Cui, Wei-wei, (2017)
An improved algorithm for the two machine flow shop problem with several availability contraints
Hadda, Hatem, (2010)
A note on "A heuristic method for two-stage hybrid flow shop with dedicated machines"
Hadda, Hatem, (2013)
A (4/3)-approximation algorithm for a special case of the two machine flow shop problem with several availability constraints
Hadda, Hatem, (2009)