//-->
Technical Notes - Lower bounding schemes for flowshops with blocking in-process
Ronconi, D.P., (2001)
A heuristic for a resource-capacitated multi-stage lot-sizing problem with lead times
Clark, A.R., (1995)
Multi-item capacitated lot-sizing by a Cross decomposition based algorithm
Souza, K.X.S.De, (1994)