//-->
A Petri net model and a general method for on and off-line multi-resource shop floor scheduling with setup times
Artigues, Christian, (2001)
On the strength of time-indexed formulations for the resource-constrained project scheduling problem
Artigues, Christian, (2017)
Heuristic and metaheuristic methods for the multi‐skill project scheduling problem with partial preemption
Polo‐Mejía, Oliver, (2021)