//-->
Performance modeling of an FMS with finite input and output buffers
Sung, C. S., (1994)
Optimal production policy for a single-product single-machine problem with intermediate machine inspection allowed
Sung, C. S., (1992)
Scheduling in a two-machine flowshop with batch processing machine(s) for earliness/tardiness measure under a common due date
Sung, C. S., (2001)