A realistic multi-manned five-sided mixed-model assembly line balancing and scheduling problem with moving workers and limited workspace
Year of publication: |
2019
|
---|---|
Authors: | Naderi, Bahman ; Azab, Ahmed ; Borooshan, Katayoun |
Published in: |
International journal of production research. - London [u.a.] : Taylor & Francis, ISSN 1366-588X, ZDB-ID 1485085-0. - Vol. 57.2019, 3, p. 643-661
|
Subject: | assembly line balancing | benders’ cuts | logic-based benders’ decomposition | mixed integer linear programming | mixed model | multi-manned | valid inequalities | Scheduling-Verfahren | Scheduling problem | Fließfertigung | Assembly-line production | Theorie | Theory | Dekompositionsverfahren | Decomposition method | Mathematische Optimierung | Mathematical programming |
-
Combinatorial Benders decomposition for mixed-model two-sided assembly line balancing problem
Huang, Dian, (2022)
-
Şahin, Murat, (2019)
-
A decomposition based solution algorithm for u-type assembly line balancing with interval data
Hazır, Öncü, (2015)
- More ...
-
Smart mobile application for short-haul cargo transportation
Azab, Ahmed, (2021)
-
Chowdhury, Nusrat T., (2024)
-
Mathematical modelling and a meta-heuristic for flexible job shop scheduling
Roshanaei, V., (2013)
- More ...