//-->
Decomposition method application to a large scale linear programming WIP projection model
Kim, J.S., (1994)
A note on improving the performance of the enhanced dynamic cycle lengths heuristic for the multi-item, single machine scheduling problem
Gascon, A., (1995)
Multi-item, single-machine scheduling problem with stochastic demands: a comparison of heuristics
Gascon, A., (1994)