A satisfiability and workload-based exact method for the resource constrained project scheduling problem with generalized precedence constraints
Year of publication: |
2021
|
---|---|
Authors: | Azevedo, Guilherme Henrique Ismael de ; Pessoa, Artur ; Subramanian, Anand |
Published in: |
European journal of operational research : EJOR. - Amsterdam : Elsevier, ISSN 0377-2217, ZDB-ID 243003-4. - Vol. 289.2021, 3 (16.3.), p. 809-824
|
Subject: | Project scheduling | Resource constraints | Satisfiability problem | Scheduling-Verfahren | Scheduling problem | Projektmanagement | Project management | Theorie | Theory | Engpass | Bottleneck |
-
Bruni, Maria Elena, (2018)
-
Minimal delaying alternatives and semi-active timetabling in resource-constrained project scheduling
Sprecher, Arno, (1996)
-
Network decomposition techniques for resource-constrained project scheduling
Sprecher, Arno, (1999)
- More ...
-
Subramanian, Anand, (2011)
-
Exact algorithms for the traveling salesman problem with draft limits
Battarra, Maria, (2014)
-
Silva, Yuri Laio T. V., (2018)
- More ...