//-->
On the probability distribution of total quality under sublot inspection and process restoration
Vickson, R.G., (1996)
Batching and Sequencing of Components at a Single Facility
Vickson, R.G., (1993)
One-Operator, Two-Machine Open Shop and Flow Shop Scheduling with Setup Times for Machines and Maximum Lateness Objective
Baki, F., (2003)