A SIMPLE LOWER BOUND FOR TOTAL COMPLETION TIME MINIMIZATION IN A TWO-MACHINE FLOWSHOP
| Year of publication: |
2005
|
|---|---|
| Authors: | LIN, B. M. T. ; WU, J. M. |
| Published in: |
Asia-Pacific Journal of Operational Research (APJOR). - World Scientific Publishing Co. Pte. Ltd., ISSN 1793-7019. - Vol. 22.2005, 03, p. 391-407
|
| Publisher: |
World Scientific Publishing Co. Pte. Ltd. |
| Subject: | Flowshop | total completion time | lower bound | branch-and-bound algorithm |
-
Wang, Jian-Jun, (2015)
-
Bicriteria two-machine flowshop scheduling : approximation algorithms and their limits
Jiang, Xiaojuan, (2024)
-
Rakrouki, Mohamed Ali, (2020)
- More ...
-
Minimization of maximum lateness under linear deterioration
Hsu, Y. S., (2003)
-
Lin, B. M. T., (1999)
-
Parallel-machine batch scheduling to minimize the maximum lateness and the number of tardy jobs
Lin, B. M. T., (2004)
- More ...