//-->
An effective mixed-model assembly line sequencing heuristic for Just-In-Time production systems
Ding, F.-Y., (1993)
A sequence-based materials flow procedure for designing manufacturing cells
Verma, P., (1995)
A constructive heuristic algorithm for concurrently selecting and sequencing jobs in an FMS environment.
Moreno, A.A., (1993)