A simulated annealing algorithm for the job shop cell scheduling problem with intercellular moves and reentrant parts
Year of publication: |
2011
|
---|---|
Authors: | Elmi, Atabak ; Solimanpur, Maghsud ; Topaloglu, Seyda ; Elmi, Afshin |
Published in: |
Computers & industrial engineering : CAIE ; an internat. journal. - Amsterdam [u.a.] : Elsevier, ISSN 0360-8352, ZDB-ID 1969936. - Vol. 61.2011, 1, p. 171-179
|
Saved in:
Saved in favorites
Similar items by person
-
A scheduling problem in blocking hybrid flow shop robotic cells with multiple robots
Elmi, Atabak, (2013)
-
A scheduling problem in blocking hybrid flow shop robotic cells with multiple robots
Elmi, Atabak, (2013)
-
Multi-degree cyclic flow shop robotic cell scheduling problem : ant colony optimization
Elmi, Atabak, (2016)
- More ...