A simultaneous and iterative approach for parallel machine scheduling with sequence-dependent family setups
Year of publication: |
2014
|
---|---|
Authors: | Shen, Liji ; Mönch, Lars ; Buscher, Udo |
Published in: |
Journal of scheduling. - New York, NY : Springer Science + Business Media LLC, ISSN 1094-6136, ZDB-ID 1492486-9. - Vol. 17.2014, 5, p. 471-487
|
Subject: | Scheduling | Batching | Parallel machines | Family setups | VNS | Scheduling-Verfahren | Scheduling problem | Theorie | Theory | Algorithmus | Algorithm | Durchlaufzeit | Lead time | Produktionssteuerung | Production control | Heuristik | Heuristics | Mathematische Optimierung | Mathematical programming |
-
Ozturk, Onur, (2017)
-
Flow shop batching and scheduling with sequence-dependent setup times
Shen, Liji, (2014)
-
An adaptive penalty guided genetic algorithm for scheduling parallel batch processing machines
Xu, Shubin, (2018)
- More ...
-
An iterative approach for the serial batching problem with parallel machines and job families
Shen, Liji, (2013)
-
An iterative approach for the serial batching problem with parallel machines and job families
Shen, Liji, (2012)
-
Xu, Hongyun, (2014)
- More ...