A two-layer dynamic scheduling method for minimising the earliness and tardiness of a re-entrant production line
Year of publication: |
2012
|
---|---|
Authors: | Yan, Ying ; Wang, Zheng |
Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 50.2012, 2 (15.1.), p. 499-515
|
Subject: | earliness/tardiness | fuzzy PI scheduling policy | PI scheduling policy | re-entrant line | two-layer dynamic scheduling | Scheduling-Verfahren | Scheduling problem | Theorie | Theory | Fließfertigung | Assembly-line production | Produktionssteuerung | Production control |
-
Performance analysis of flow lines with non-linear flow of material
Helber, Stefan, (1999)
-
Constraint propagation algorithms for the car sequencing problem
Matthiessen, Lars, (2000)
-
Meyr, Herbert, (1999)
- More ...
-
Yan, Ying, (2012)
-
Credit rationing, bankruptcy cost, and the optimal debt contract for small business
Yan, Ying, (1997)
-
Trust and investment corporations in China
Hong, Zhaohui, (1997)
- More ...