A two-stage flexible flow shop problem with unit-execution-time jobs and batching
Year of publication: |
2014
|
---|---|
Authors: | Gerstl, Enrique ; Mosheiov, Gur |
Published in: |
International Journal of Production Economics. - Elsevier, ISSN 0925-5273. - Vol. 158.2014, C, p. 171-178
|
Publisher: |
Elsevier |
Subject: | Deterministic scheduling | Flexible flowshop | Makespan | Batch scheduling |
-
A two-stage flexible flow shop problem with unit-execution-time jobs and batching
Gerstl, Enrique, (2014)
-
Rescheduling for machine disruption to minimize makespan and maximum lateness
Liu, Zhixin, (2014)
-
Ozturk, Onur, (2012)
- More ...
-
A two-stage flow shop batch-scheduling problem with the option of using Not-All-Machines
Gerstl, Enrique, (2013)
-
Due-window assignment with identical jobs on parallel uniform machines
Gerstl, Enrique, (2013)
-
Due-window assignment with identical jobs on parallel uniform machines
Gerstl, Enrique, (2013)
- More ...