A variable neighbourhood descent algorithm for the open-pit mine production scheduling problem with metal uncertainty
Uncertainty is an inherent aspect of the open-pit mine production scheduling problem (MPSP); however, little is reported in the literature about solution methods for the stochastic versions of the problem. In this paper, two variants of a variable neighbourhood descent algorithm are proposed for solving the MPSP with metal uncertainty. The proposed methods are tested and compared on actual large-scale instances, and very good solutions, with an average deviation of less than 3% from optimality, are obtained within a few minutes up to a few hours.
Year of publication: |
2014
|
---|---|
Authors: | Lamghari, Amina ; Dimitrakopoulos, Roussos ; Ferland, Jacques A |
Published in: |
Journal of the Operational Research Society. - Palgrave Macmillan, ISSN 0160-5682. - Vol. 65.2014, 9, p. 1305-1314
|
Publisher: |
Palgrave Macmillan |
Saved in:
Saved in favorites
Similar items by person
-
Lamghari, Amina, (2012)
-
Lamghari, Amina, (2012)
-
Lamghari, Amina, (2014)
- More ...