A WIP control policy for tandem lines
Year of publication: |
2009
|
---|---|
Authors: | Subramaniam, Velusamy ; Rongling, Yang ; Ruifeng, Chen ; Singh, Surya Prakash |
Published in: |
International journal of production research. - London : Taylor & Francis, ISSN 0020-7543, ZDB-ID 160477-6. - Vol. 47.2009, 4 (15.2.), p. 1127-1149
|
Subject: | Fließfertigung | Assembly-line production | Produktionssteuerung | Production control | Terminplanung | Time scheduling | Welt | World | Theorie | Theory |
-
Produktionsmengen- und -terminplanung bei mehrstufiger Linienfertigung
Kühnle, Hermann, (1987)
-
Performance evaluation of an automatic transfer line with WIP scrapping during long failures
Liberopoulos, George, (2007)
-
Variable takt time groups and workload equilibrium
Mönch, Tobias, (2022)
- More ...
-
A WIP control policy for tandem lines
Subramaniam, Velusamy, (2009)
-
Increasing production rate in Kanban controlled assembly lines through preventive maintenance
Ruifeng, Chen, (2012)
-
Performance evaluation for tandem multi-factory supply chains: an approximate solution
Ruifeng, Chen, (2011)
- More ...