//-->
Dynamic project scheduling with reduction of activity durations
Fujiwara, Toshihisa, (2016)
Railway Scheduling Reduces the Expected Project Makespan
Tian, Wendi, (2010)
Minimizing the Expected Makespan of a Project with Stochastic Activity Durations Under Resource Constraints
Creemers, Stefan, (2015)
The resource-constrained activity insertion problem with minimum and maximum time lags
Artigues, Christian, (2009)
Fast minimum float computation in activity networks under interval uncertainty
Garaix, Thierry, (2013)
A matheuristic with fixed-sequence reoptimization for a real-life inventory routing problem
He, Yun, (2020)